Introduction
Technical reports
Publications and presentations
Photographs
Meetings
Mechanical design
Off-line Commissioning
Installation
People
Links
Home
2007
30.05.07 (Presentation)
08.08.2007 Minutes
11.12.2007 Minutes
2006
2005
09.02.05 (Presentation)
21.09.05 (Presentation)
07.12.05
2004
15.11.04
2003
26.03.03
09.04.03
30.04.03
07.05.03
28.05.03
11.06.03
30.07.03
28.08.03(Transparences)
17.12.03
Specific meetings
Meetings with vacuum group Vacuum system (01/03/03) Vacuum-control system (12/05/03) Vacuum layout (06/06/03) Meetings with radioprotection group Contamination in vacuum system (06/05/03) Meetings for beam extraction optics design 29/07/03 Meetings for mechanical design 29/08/03 30/09/03 (insulators) Meetings with High Voltage safety HV safety in building 275 (12/12/03)
Meetings with vacuum group
Vacuum system (01/03/03)
Vacuum-control system (12/05/03)
Vacuum layout (06/06/03)
Meetings with radioprotection group
Contamination in vacuum system (06/05/03)
Meetings for beam extraction optics design
29/07/03
Meetings for mechanical design
29/08/03
30/09/03 (insulators)
Meetings with High Voltage safety
HV safety in building 275 (12/12/03)
Last updated 11.12.2007 by Hanna Franberg