Pictures from the installation

Here is various pictures to be found from the RFQ installation and commissioning work. If you are missing any photo please let me know.

Here is a the photos from the:

Platform construction:

Demounting of the RFQ:

Alignment:

Getting it in place

Installation

Electrical connections

The DC connectors

This photo is inverted, Connector 1 is on the right and 2 is on the left.

The extraction side of the DC rings.

 

Rack 60

ISCOOL control room